Projects
Fort Bend Town Center Clearing & Grubbing
This project consisted all tasks for Clearing and Grubbing for Proposed Detention, Detention Spoils Area, Floodplain Mitigation, Streets, and Utilities to Serve Fort Bend Town Center III, in accordance with the technical specifications contained in the contract...
Harris County District 9 Water, Sewer and Storm Water Systems
Construction of Water Distribution, Sanitary Sewer, Storm Sewer and 8" Water Line Crossing Moonlight Mist Drive Connection Serving Sunset Ridge East Reserve Sec. 1. This project involved five separate task groups: Site Preparation: stripping and site preparation for...
Willow Creek Trail Extension
GDI furnished all labor, equipment, tools, supplies, materials, transportation, supervision, and incidentals to construct the Willow Creek Trail Extension project within Harris County Municipal Utility District No. 401, in accordance with the technical specifications...
City of Dickinson Oak Park Street Paving and Drainage Improvement
Water Distribution: GDI furnished all labor, equipment, tools, supplies, materials, transportation, supervision, and incidentals to construct the Oak Park Street Drainage Improvement project, which includes, but is not limited to, mobilization, traffic control,...
Meridiana Water, Wastewater and Storm Water
This project involved four separate task groups: Site Preparation: stripping and site preparation for all areas to receive fill where organics and deleterious materials are present to a minimum depth of 4-inch below natural ground prior to the excavation, placement...
Murrell Park Road Repair and Repaving
This project consisted of removing existing asphalt, installing new asphalt and concrete pavement, and reestablishing the drainage. GDI removed approximately 2 to 4 inches of existing asphalt on approximately 431 LF of Park road. Average width of the road was...
Village of the Hills Walking Trail
The walking rail at the Village of the Hills needed to be extended in this project. The work consisted of removing the existing concrete driveways, construction of colored walking trail, repairing and reestablishing drainage, construction of the driveways,...
Rockport Beach Entrance Improvements
In this project, GDI removed the concrete pavement, widened the subgrade, and excavating 12” of existing roadway. GDI then installed new concrete pavement, concrete curb and gutter, concrete ribbon curb for flush islands, concrete Sidewalk, steel sidewalk drain,...