GDI furnished all labor, equipment, tools, supplies, materials, transportation, supervision, and incidentals to construct the Willow Creek Trail Extension project within Harris County Municipal Utility District No. 401, in accordance with the technical specifications contained in the contract documents and the scope of work outlined below.
Project Name:
Willow Creek Trail Extension
Project Location:
Harris County Municipal Utility District No. 401
Contract Date:
07/22/2022 (NTP)
Contract Amount:
$461,698.50
Owner:
Harris County Municipal Utility District No. 401
Volger & Spencer Engineering
Performed Tasks:
Site Preparation and Earthwork
Removal and disposal of existing concrete
6″ Reinforced Concrete Pavement for 6′ Wide Trail (SY 3090)
6″ Cement Stabilized Sand Base for Concrete Trails (Compacted and Field Tested inPlace) – SY 3450
Sodding- Provide and Install on both sides of concrete trail, 18″ width – SY 1040
5″ Thick Reinforced Concrete Slope Paving – SY 425
Sodding- Provide and Install for Disturbed Areas Around Slope Paving – SY 1000
Reinforced Filter Fabric – LF 3600
4-1/2” Thick Reinforced Concrete Sidewalk w/ 2” Sand Base – SY 200
10′ Wide Backslope Swale
Remove & haul off spoils generated from pavement excavation