Willow Creek Trail Extension

GDI furnished all labor, equipment, tools, supplies, materials, transportation, supervision, and incidentals to construct the Willow Creek Trail Extension project within Harris County Municipal Utility District No. 401, in accordance with the technical specifications contained in the contract documents and the scope of work outlined below.

 

Project Name: Willow Creek Trail Extension
Project Location: Harris County Municipal Utility District No. 401
Contract Date: 07/22/2022 (NTP)
Contract Amount: $461,698.50
Owner: Harris County Municipal Utility District No. 401
Volger & Spencer Engineering
Performed Tasks:

  • Site Preparation and Earthwork
  • Removal and disposal of existing concrete
  • 6″ Reinforced Concrete Pavement for 6′ Wide Trail (SY 3090)
  • 6″ Cement Stabilized Sand Base for Concrete Trails (Compacted and Field Tested inPlace) – SY 3450
  • Sodding- Provide and Install on both sides of concrete trail, 18″ width – SY 1040
  • 5″ Thick Reinforced Concrete Slope Paving – SY 425
  • Sodding- Provide and Install for Disturbed Areas Around Slope Paving – SY 1000
  • Reinforced Filter Fabric – LF 3600
  • 4-1/2” Thick Reinforced Concrete Sidewalk w/ 2” Sand Base – SY 200
  • 10′ Wide Backslope Swale
  • Remove & haul off spoils generated from pavement excavation
  • Refresh Grade 2 Rip-Rap
  • Grading

 