Water Distribution: GDI furnished all labor, equipment, tools, supplies, materials, transportation, supervision, and incidentals to construct the Oak Park Street Drainage Improvement project, which includes, but is not limited to, mobilization, traffic control, pavement removal, trench safety, utility identification and location, storm sewer installation, paving and subgrade, desilting of roadside ditches, demobilization and cleanup, in accordance with the technical specifications contained in the contract documents and the scope of work outlined below.
Project Name: | City of Dickinson Oak Park Street Paving and Drainage Improvement |
Project Location: | City of Dickinson (Galveston County) 4403 Highway 3, Dickinson, Texas 77539 |
Contract Date: | 05/03/2022 |
Contract Amount: | $360,531.26 |
Owner: | City of Dickinson, Texas |
Performed Tasks:
|
No. |
SCOPE OF WORK |
UNIT | QUANTITY |
A SITE PREPARATION AND EARTHWORK | |||
1 | SITE PREPARATION (Saw cut full depth) | LF | 421.0 |
2 | EXCAVATION AND BACKFILL FOR STRUCTURES | CY | 559 |
3 | SITE PREPARATION- (Remove and Dispose of Existing Concrete Pipe) | LF | 36 |
4 | SITE PREPARATIONS- (Remove & Relocate or Dispose of Traffic Signs, Mail Boxes and Roadway Signs) |
LS | 1 |
5 | REMOVE EXISTING PAVEMENTS AND STRUCTURES- Curbing | LF | 278 |
6 | REMOVE EXISTING PAVEMENTS AND STRUCTURES (Driveways) | SY | 557 |
7 | REMOVE EXISTING PAVEMENTS AND STRUCTURES (Asphalt Roadway) | SY | 2,124 |
8 | REMOVE EXISTING PAVEMENTS AND STRUCTURES- Remove and Dipose Existing Reinforced Concrete Pavement (All Depths) |
SY | 436 |
B DRAINAGE | |||
9 | SODDING (Erosion Control and Stabilization 24″ Wide) | SY | 831 |
10 | HYDROMULCH SEEDING (Side Slopes and Ditches) | SY | 874 |
11 | TRENCH SAFETY SYSTEMS (5′ to 10′) | LF | 104 |
12 | REINFORCED CONCRETE PIPE C76, Class III, Rubber Gasket (18″) | LF | 50 |
13 | REINFORCED CONCRETE ARCH PIPE Rubber Gasket (13.5″ X 22″) | LF | 54 |
14 | CAST-IN PLACE INLETS, HEADWALLS, AND WINGWALLS (Type ‘A’ Inlet) | EA | 3 |
15 | ADJUSTING MANHOLES, INLETS, AND VALVE BOXES TO GRADES | EA | 3 |
C PAVING | |||
16 | LIME STABILIZED SUBGRADE (6″) | SY | 2,272 |
17 | CONCRETE PAVING (6″) | SY | 2,124 |
18 | CONCRETE DRIVEWAYS (6″) | SY | 566 |
19 | CONCRETE SIDEWALKS (5ft Wide) | LF | 45 |
D TRAFFIC CONTROL | |||
20 | TRAFFIC CONTROL AND REGULATION – (Furnish-Install & Remove) | Month | 3 |
21 | TRAFFIC CONTROL AND REGULATION (Flagmen) | Hr | 10 |
E STORM WATER POLLUTION PREVENTION PLAN | |||
22 | Type 2: REINFORCED FILTER FABRIC BARRIER (60% of unit cost for furnish and installation and 40% of unit cost for removal) | LF | 140 |
23 | SOURCE CONTROLS FOR EROSION AND SEDIMENTATION- Inlet Protection Barriers (for Stage II Inlets, Gravel Bags) (60% of unit cost for furnish and installation and 40% of unit cost for removal) |
EA | 9 |
24 | SOURCE CONTROLS FOR EROSION AND SEDIMENTATION- Rock Filter Dam (Type 2) (60% of unit cost for furnish and installation and 40% of unit cost for removal) |
LF | 216 |